Construction time reduction of 5 to 12 weeks for fresh screeds, prevention of screed deformation, crack bridging and protection against mould are just some of the product benefits of the DURABASE CI++ decoupling mat. With fresh screed, the average waiting time (drying time) is 5-12 weeks before tiles can be laid. With the 3-layer construction of DURABASE CI++, tiling is possible directly the next day, i.e. as soon as the floor can be walked on. With its crack bridges bridging
and optimised shear force protection, it allows tiles to be laid on damaged but still load-bearing old coverings - ideal for renovation and old buildings.
Additional information
Basic material
Polyethylen
Colours(s)
yellow
Series overview. For details, please refer to the current price list or the corresponding data sheet.